CSVA is helping Canadians stay
competitive by improving
value in their projects,
processes and products
through the application
of the value methodologies.

 
... ...
View Event »
 
This year SAVE has changed the format and agenda of their annual meeting. With the change comes many exciting enhancements to extend your opportunities to learn and network. There are also two new tracks being offered. You will now be able to choose from the Educational/Training Track including introductory sessions ...
View Event »

News


12.06.13
FPS Presentation at Design for Manufacture and Assembly (DFMA®)
Lucie Parrot, eng. CVS-life, our VP Communications,  will ...
more »
30.04.13
Certification in Management of Value
8 questions per paper ...
more »
16.04.13
CSVA at the Order of Engineers of Québec
CSVA was present at the Order of Engineers ...
more »
  • <p>Project tender ~ 100% over budget, project would not be built unless costs could be reduced.</p>
  • Widen QEW by Twinning Bronte Creek Bridge Rehab Existing Heritage Bridge, Upgrade IC, $32 M
  • Two Used Fuel Cell Dry Storage Cell Buildings   $36M CDN (Add’l $144M for future buildings)
  • Revise the ATC design to include Food Services  $100,000 CDN (excluding finishes)
  • Unfavourable reports by the  Auditor General and Ombudsman, ministry in crisis
  • The detail design for Highway 17/417 Twinning from Lanark Road 29 to Division St, including New Interchanges and Service Roads.
  • The method of ensuring that commercial vehicles are safe had changed from weight enforcement to checking that mechanical fitness and driver fitness. The design standard for commercial vehicle enforcement facilities had remained focused on weight enforcement. A Value Engineering/ Value Analysis Study was needed to quickly develop innovative new design concepts and standards for a new style of commercial vehicle inspection facilities. Road User Safety
  • Detail Design Study for Howard Ave / CPR Grade separation; 4 days study held at 30% design stage, prior to detail design work
  • Primary distribution lines for Lemieux Island Water Treatment Plant
  • Highway 7 new alignment from Kitchener to Guelph including directional interchange at the highway 7 and KWE and six other interchanges, 3 major water crossings including Grand River.
Home    |   CSVA    |   About VA    |   What's new    |   Publications    |   Contact us    |      Privacy Policy    |
Copyright © SCAV-CSVA 2013