Highway 7 New Alignment – Kitchener to Guelph

| Project Cost |
Highway 7 new alignment from Kitchener to Guelph including directional interchange at the highway 7 and KWE and six other interchanges, 3 major water crossings including Grand River. |
| VE Goal(s) |
Validate/ Improve Design, Improve Constructability, Improve Safety, Risk Analysis. |
| VE Benefit(s) |
$22 million in savings. Improved mainline operations. Aesthetic improvements to the Grand River Structure. |