Highway 7 New Alignment – Kitchener to Guelph



 
 Project Cost

Highway 7 new alignment from Kitchener to Guelph including directional interchange at the highway 7 and KWE and six other interchanges, 3 major water crossings including Grand River.

 VE Goal(s)

Validate/ Improve Design, Improve Constructability, Improve Safety, Risk Analysis.

 VE Benefit(s)

$22 million in savings. Improved mainline operations. Aesthetic improvements to the Grand River Structure.


view all stories here

 

Home    |   CSVA    |   About VA    |   What's new    |   Publications    |   Contact us    |      Privacy Policy    |
Copyright © SCAV-CSVA 2013